Author:
Asiedu Richard Ohene,Ameyaw Collins
Abstract
PurposeThis study aimed at developing and empirically testing a system dynamics causal loop (SDCL) model for investigating factors related to the risk of cost overruns, associated with the performance of construction projects in developing countries.Design/methodology/approachUsing data derived from the Ghanaian construction industry (GCI), a conceptual system dynamics model was hypothesised and empirically tested.FindingsSupported by empirical evidence, the study established that the low technical capacity of consultants is the underlying cause of cost overruns in government projects. There is a strong proof of the relationship between the results of the SDCL model and poor contract planning and supervision, change orders, competence of the project team and the lack of effective coordination amongst the contractual parties.Practical implicationsThe final SDCL model has revealed key risk components that would require standard mitigation measures in order to achieve “acceptable success” in construction projects.Originality/valueThe study presents an interactive approach for construction practitioners in developing countries to prioritise the causes of cost overruns in order to initiate quick responses.
Subject
Building and Construction,Civil and Structural Engineering
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献