Determining a reasonable concession period for risky transportation BOT projects with government subsidies based on cumulative prospect theory

Author:

Guo Jian,Chen Junlin,Xie Yujie

Abstract

PurposeThis paper explores the impact of both government subsidies and decision makers' loss-averse behavior on the determination of transportation build-operate-transfer (BOT) concession periods based on cumulative prospect theory (CPT). The prospect value of a transportation project under traffic risk can be formulated according to the value function for gains and losses and the decision weight for gains and losses. As an extra income for investors, government subsidy is designed for highly risky aspects of BOT transportation projects: uncertain initial traffic volumes and fluctuating growth rates.Design/methodology/approachA decision-making model determining the concession period of a transportation BOT project is proposed by using the Monte-Carlo simulation method based on CPT, and the effects of risky behaviors of private investors on concession period decision making are analyzed. A subsidy method related to the internal rate-of-return (IRR) corresponding to a specific initial traffic volume and growth rate is proposed. The case of an actual BOT highway project is examined to illustrate how the method proposed can be used to determine the concession period of a transportation BOT project considering decision makers' loss-averse behavior and government subsidy. Contingency analysis is discussed to cope with possible misestimating of key factors such as initial traffic volume and cost coefficients. Sensitivity analysis is employed to investigate the impact of CPT parameters on the concession period decisions. An actual BOT case which failed to attract private capital is introduced to show the practical application. The results are then interpreted to conclude this paper.FindingsBased on comparisons drawn between a concession period decision-making model considering the psychological behaviors of decision makers and a model not considering them, the authors conclude that the concession period based on CPT is distinctly different from that of the loss-neutral model. The concession period based on CPT is longer than the loss-neutral concession period. That is, loss-averse private investors tend to ask for long concession periods to make up for losses they will face in the future. Government subsidies serve as extra income for investors, allowing appointed profits to be secured sooner. For the benefit side of contingency variables, the normal state of initial traffic volume, average annual traffic growth rate and bias degree and the government subsidy need to be paid close attention during the project life span. For the cost side of contingency variables, the annual operating cost variable has a significant impact on the length of predicted concession period, while the large-scale cost variable has minor impact.Originality/valueWith an actual BOT highway project, the determination of transportation BOT concession periods based on the psychological behaviors of decision makers is analyzed in this paper. As the psychological behaviors of decision makers heavily impact the decision-making process, the authors analyze their impacts on concession period decision making. Government subsidy is specifically designed for various states of initial traffic volume and fluctuating growth rates to cope with corresponding high risks and mitigate private investors' loss-averse behaviors. Contingency analysis and sensitivity analysis are discussed as the estimated values of parameters may not be authentic in actual situations.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference53 articles.

1. An alternative incomplete information bargaining model for identifying the reasonable concession period of a BOT project;International Journal of Project Management,2015

2. Determining optimal capital structure and concession period length in BOT scheme using trilateral bargaining game model;Journal of Infrastructure Systems,2019

3. Bargaining game model to determine concessionary items in build-operate-transfer contracts;Journal of Construction Engineering and Management,2020

4. An axiomatization of cumulative prospect theory for decision under risk;Journal of Risk and Uncertainty,1998

5. Valuing governmental support in infrastructure projects as real options using Monte Carlo Simulation;Construction Management and Economics,2006

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3