Accuracy of road construction preliminary estimate: examining the influencing factors

Author:

Akinradewo OpeoluwaORCID,Aigbavboa Clinton,Oke AyodejiORCID

Abstract

PurposePreparation of preliminary estimate is difficult owing to the lack of full project details in the early phases of the construction project. This paper seeks to assess the estimation techniques used for road projects and the critical factors affecting their accuracy in the Ghanaian construction industry.Design/methodology/approachQuantitative research design was adopted and questionnaire was designed to retrieve data. The target population were engineers and quantity surveyors who were contacted using an e-questionnaire through their professional bodies owing to location constraints. Retrieved data were analysed using descriptive and exploratory factor analysis. In order to compare the opinions of the respondents, the Mann–Whitney U-test was employed.FindingsThe survey revealed that subjective, parametric, comparative and analytical estimations are in use in Ghana. The most critical factors influencing the accuracy of estimation techniques are improper project planning, insufficient preliminary site investigation and usage of shortcuts, among others.Research limitations/implicationsThis study was limited to Accra, Ghana, due to time and distance constraint.Practical implicationsFor accuracy of preliminary estimates to be improved, estimators being the custodian of the estimate are expected to be devoid of errors such as arithmetic calculation errors, inaccurate quantity measurement and error of omission. The usage of estimating software can eliminate these human errors.Originality/valueThe study will assist policymakers and stakeholders in aligning mitigative actions for factors influencing preliminary estimate of road projects with defined clusters rather than basic ranks. With attention focussed on the characteristics of each cluster, accuracy of preliminary estimate can be improved.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference41 articles.

1. Developing parametric model for conceptual cost estimate of highway projects;International Journal of Engineering Science and Computing,2016

2. Evaluation of material and labour estimating accuracy in the Nigerian construction industry,2019

3. Analysis of factors influencing project cost estimating practice;Construction Management and Economics,2000

4. Project cost estimation: issues and the possible solutions;International Journal of Engineering and Technical Research (IJETR),2014

5. Factors influencing accuracy of construction project cost estimates in Pakistan: perception and reality;International Journal of Construction Management,2015

Cited by 5 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3