A model for work packages optimization in results-based-finance projects

Author:

Shalaby AmiraORCID,Ezeldin A. Samer

Abstract

PurposeIn many developing countries, the sanitation sector constitutes a major part of their strategic plans of reform. Yet with the very limited budget of the public treasury, countries opt to major lending institutions for funds. “Results-Based-Finance” is a new funding mechanism that has proven its efficiency in achieving the necessary reform in sanitation sectors. Due to the complexity of the funding tool, it is crucial to be able to decompose the project into smaller packages to be able to effectively control the project. The objective of this paper is to reach an optimum packaging scheme that enables the project to be successfully managed through better planning and cost control practices.Design/methodology/approachWith the aid of Unified Modelling Language (UML), an algorithm is developed to map the logic behind the model suggested with detailed illustrations of its different modules. Object-oriented processes and operations are modeled using different diagrams of the language, which automatically generate the optimum packaging combination. The packaging model is then implemented via a number of computer-aided programs. The Microsoft Excel 2019 is used for calculation purposes. Visual Basic for Applications (VBA) programming language is used to make the model user-friendly for non-engineering stakeholders. The Palisade's Decision Tools Suite is used for the optimization processFindingsThe model is validated through a case study of a mega sanitation project located in Egypt. The model output is not only the content of the packages but also a complete managing plan which demonstrates many useful information to the decision-makers and government officials.Originality/valueThe research aim is to provide the construction industry with a tool that makes the packaging process of mega projects funded through the “Results-Based-Finance” mechanism, done in an automated manner. Moreover, the packages are selected in a way to optimize the project cashflow. Having the optimum package size shall ensure better planning and a more accurate cost control. Yet it is a challenging task; especially, when the project cash flow is very sensitive and intolerant to delays like in the “Results-Based-Finance” mechanism.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference55 articles.

1. Utility of genetic algorithms for solving large-scale construction time-cost trade-off problems;Journal of Computing in Civil Engineering,2018

2. Agenor, P.-R., Nabil, M.K. and Yousef, T.M. (2005), Public Infrastructure and Private Investment in the Middle East and North Africa, World Bank Policy Research Working Paper No, 3661.

3. Discounted cash flow time-cost trade-off problem optimization; aco approach;Asian Journal of Civil Engineering (Building and Housing),2011

4. Optimizing financing cost in construction projects with fixed project duration;Journal of Construction Engineering and Management,2018

5. Maximizing expected contractor profit using an integrated model;Engineering Construction and Architectural Management,2019

Cited by 3 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3