Author:
Omotayo Temitope Seun,Boateng Prince,Osobajo Oluyomi,Oke Adekunle,Obi Loveline Ifeoma
Abstract
PurposeThe purpose of this paper is to present a capability maturity model (CMM) developed to implement continuous improvement in small and medium scale construction companies (SMSCC) in Nigeria.Design/methodology/approachA multi-strategy approach involving qualitative studies of SMSCC in Nigeria was conducted. Semi-structured interviews were conducted with purposively selected construction experts in Nigeria to identify variables essential for continuous improvement in SMSCC. Data collected were thematically analysed using NVIVO. Subsequently, a system thinking approach is employed to design and develop the CMM for implementing continuous improvement SMSCC, by exploring possible relationships between the variables established.FindingsCMM provided a five-level approach for the inclusion of investigated variables such as team performance; culture; structure; post-project reviews, financial risk management, waste management policy and cost control. These variables are factors leading to continuous improvement in SMSCC, implementable within a six to seven and a half years’ timeline.Practical implicationsThe system thinking model revealed cogent archetypes in the form of reinforcing loops that can be applied in developing the performance of SMSCC. Continuous improvement is feasible. However, it takes time to implement. Further longitudinal studies on the cost of implementing continuous improvement through CMM a knowledge transfer project can be initiated.Originality/valueA methodical strategy for enhancing the effectiveness and operations of SMSCC in developing countries can be extracted from the causal loop diagram and the CMM.
Subject
Strategy and Management,General Business, Management and Accounting
Reference95 articles.
1. A capability maturity model for corporate performance management – an empirical study in large Finnish manufacturing companies,2013
2. A lean construction framework with Six Sigma rating;International Journal of Lean Six Sigma,2012
3. Critical literature review on maturity models for business process excellence,2014
4. Knowledge sharing maturity model for Jordanian construction sector;Engineering, Construction and Architectural Management,2017
5. Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors;Construction Innovation,2016
Cited by
28 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献