1. The part mix and routing mix problem in FMS: a coupling between an LP model and a closed queueing network
2. A comparative analysis of due date based job sequencing rules in a flow shop with multiple processors
3. Heterogeneous dispatching rules in job and flow shops
4. Chakravarty, A.K. (1997), “A model for switching despatching rules in real time in a flexible manufacturing cell”, Journal of Production and Operations Management, Vol. 6 No. 1, pp. 398‐418.
5. Chakravarty, A.K. and Shtub, A. (1987), “Capacity, cost and scheduling analysis for a multiproduct flexible manufacturing cell”, International Journal of Production Research, Vol. 25 No. 8, pp. 1143‐56.