1. Dietz, M. (1992), “Outline of a successful simulation project”,Industrial Engineering, November, pp. 50‐3.
2. Grabau, M.R. and Maurer, R.A. (1997), “Using simulation to generate the data to balance an assembly line”,Proceedings of the 1997 Winter Simulation Conference, Atlanta, GA, pp. 733‐8.
3. Data requirements for analysis of manufacturing systems using computer simulation
4. Law, A.M. (1990), “How to build valid, credible and appropriately detailed simulation models”,Industrial Engineering, April, pp. 16‐17.
5. Law, A.M., McComas, M.G. and Vincent, S.G. (1994), “The crucial role of input modelling in successful simulation studies”,Industrial Engineering, July, pp. 55‐9.