1. Cunagin, D. (1999), “Maximizing time‐compression in the product development process”, Time‐compression Technologies, Vol. 4 No. 3, pp. 24‐31.
2. Ferrara, C.M. (1998), “Crunch time for engineers”, Design News (online), 5 May, available: www.manufacturing.net/magazine/dn/archives/1998/dn0504.98/09f1618.htm
3. Field, K.A. (1999), “Fast track to management”, Design News (online), 5 July, available: www.manufacturing.net/magazine/dn/archives/1999/dn0705.99/feature2.html
4. Hanson, T. (1998), Personal interview, Tool Designer, Teledyne Water Pik.
5. Hars, A. (1998), “In Japan it’s CAM/CAD, not CAD/CAM”, Design News (online), 20 July, available: www.manufacturing.net/magazine/dn/archives/1998/dn0720.98/feature2.html