1. Abdul‐Rahman, H. (1997), “Some observations on the issues of quality cost in construction”, International Journal of Quality & Reliability Management, Vol. 15 No. 5, pp. 461‐81.
2. Abdul‐Rahman, H., Thompson, P.A. and Whyte, I.L. (1996), “Capturing the cost of non‐conformance on construction sites: an application of the quality cost matrix”, International Journal of Quality & Reliability Management, Vol. 13 No. 1, pp. 48‐60.
3. Atkinson, J., Hohner, J., Mundt, B., Troxel, R., Winchell, W. and Montvale, N. (1991), Current Trends in Cost of Quality: Linking the Cost of Quality and Continuous Improvement, National Association of Accountants – KPMG.
4. British Standards Institute (1990), BSI Handbook 22. BS 6143: Guide to the Economics of Quality. Part 1: Process Cost Model (Revised), British Standards Institute, London.
5. British Standards Institute (1992), BSI Handbook 22. BS 6143: Guide to the Economics of Quality. Part 2: Prevention, Appraisal and Failure Model (Revised), British Standards Institute, London.