1. (The) Economist(1992), 18 April.
2. Hutchins, D. (1998), “Introducing TPM’’,Manufacturing Engineer, February.
3. IDS Study 407 (1988),Flexibility Working, April, London.
4. IDS Study 610 (1996),Paying for Multi‐skilling, March, London.
5. Patterson, J., Kennedy, W. and Fredendall, L. (1995), “Total productive maintenance is not for this company”,Production and Inventory Management Journal, second quarter.