Critical success factors for local government project stakeholder management

Author:

Amoatey CharlesORCID,Hayibor Mawuena Vincent Kodzo

Abstract

Purpose The purpose of this paper is to investigate the critical success factors (CSFs) for effective project stakeholder management at the local government level in Ghana. Design/methodology/approach The study used data from questionnaires administered to project stakeholders for identifying and ranking CSFs. Findings The study identified the top five CSFs for stakeholder management at the local government level in Ghana to be: communicating with and engaging stakeholders; identifying stakeholders properly; formulating a clear project mission statement; keeping and promoting good relationships; and analyzing stakeholder conflicts and coalitions. Research limitations/implications Generalization of the findings should be done with caution since the scope of data collection was limited to district assemblies in the Greater Accra region of Ghana. Nevertheless the results of the study are, however, useful and indicative and can lend direction to future research. Practical implications This paper has contributed to the growing body of knowledge related to CSFs for local government projects. The results should help understand factors which are of priority to stakeholders when assessing their involvement in projects. Further, the findings could form the basis for competency development of local government personnel in specific areas where improvements are required. Originality/value The paper identified CSFs for effective project stakeholder management at the local level. Most studies on critical factors in project environments have focused on CSFs and project success and thus this study delves into an area which has not received much attention in the literature.

Publisher

Emerald

Subject

Management Science and Operations Research,Civil and Structural Engineering

Reference79 articles.

1. Stakeholder salience in global projects;International Journal of Project Management,2008

2. Analysis of factors influencing project cost estimating practice;Construction Management and Economics,2000

3. Engaging stakeholders in performance-based building: lessons from the performance-based building (PeBBu) network;Building Research & Information,2005

4. Handbook on Stakeholder Consultation and Participation in ADB operations,2001

Cited by 26 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3