Author:
Peng Au-Yong Cheong,Shah Ali Azlan,Ahmad Faizah
Abstract
Purpose
– High-maintenance cost is the common issue in building industry due to low service quality of maintenance management in Malaysia. Lack of preventive measure is the problem that implicates poor maintenance performance. Scheduled maintenance is suggested to improve the maintenance performance. However, the effectiveness of scheduled maintenance can be greatly influenced by the availability of skilled technicians. Thus, the purpose of this paper is to identify the aspects of skilled technician to be concerned in maintenance management, as well as to establish the relationship between the aspects and maintenance cost performance.
Design/methodology/approach
– A quantitative approach is adopted and carried out through questionnaire survey. Furthermore, descriptive analysis and correlation analysis are used to analyse the research data.
Findings
– The literature review identifies three aspects of skilled technician to be concerned in maintenance management. Then, research result demonstrates that the skill and knowledge of technician is significantly correlated to the maintenance cost variance. The skill and knowledge of technician must be considered in maintenance planning and execution.
Originality/value
– The research recommends the maintenance management to employ skilled technician through thorough hiring process and to encourage the existing maintenance staff for participating the relevant training, workshop, or seminar.
Subject
Building and Construction,Civil and Structural Engineering
Reference27 articles.
1. Ali, A.S.
(2009), “Cost decision making in building maintenance practice in Malaysia”, Journal of Facilities Management, Vol. 7 No. 4, pp. 298-306.
2. Ali, A.S.
,
Kamaruzzaman, S.N.
,
Sulaiman, R.
and
Au Yong, C.P.
(2010), “Factors affecting housing maintenance cost in Malaysia”, Journal of Facilities Management, Vol. 8 No. 4, pp. 285-298.
3. Amaratunga, D.
and
Baldry, D.
(2002), “Moving from performance measurement to performance management”, Facilities, Vol. 20 Nos 5/6, pp. 217-223.
4. Au-Yong, C.P.
,
Ali, A.S.
and
Ahmad, F.
(2013), “Office building maintenance: cost prediction model”, Gradevinar, Vol. 65 No. 9, pp. 803-809.
5. Au-Yong, C.P.
,
Ali, A.S.
and
Ahmad, F.
(2014), “Significant characteristics of scheduled and condition-based maintenance in office building”, Journal of Performance of Constructed Facilities, Vol. 28 No. 2, pp. 257-263.
Cited by
12 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献