Barriers to integrating lean construction and integrated project delivery (IPD) on construction megaprojects towards the global integrated delivery (GID) in multinational organisations: lean IPD&GID transformative initiatives

Author:

Evans Martin,Farrell Peter,Elbeltagi Emad,Dion Helen

Abstract

Purpose The architecture, engineering and construction (AEC) industry encounter substantial risks and challenges in its evolution towards sustainable development. International businesses, multinational AEC organisations, technical professionals, project and portfolio management organisations face global connectivity challenges between business units, especially during the outbreak of novel coronavirus pandemic, to manage construction megaprojects (CMPs). That raises the need to manage global connectivity as a main strategic goal of global organisations. This paper aims to investigate barriers to integrating lean construction (LC) practices and integrated project delivery (IPD) on CMPs towards the global integrated delivery (GID) transformative initiatives and develop future of work (FOW) global initiatives in contemporary multinational AEC organisations. Design/methodology/approach A two-stage quantitative and qualitative research approach is adopted. The qualitative research methodology consists of a literature review to appraise barriers to integrating LeanIPD&GID on CMPs. Barriers are arranged into six-factor clusters (FCs), with a conceptualisation of LeanIPD&GID, GID strategy placements and FOW global initiatives with multiple validations. This analysis also involved semi-structured interviews and focus group techniques. Stage two consisted of an empirical questionnaire survey that shaped the foundation of analysis and findings of 230 respondents from 23 countries with extensive cosmopolitan experience in the construction of megaprojects. The survey examined a set of 28 barriers to integrating LeanIPD&GID on CMPs resulting from a detailed analysis of extant literature after validation. Descriptive and inferential statistical tests were exploited for data analysis, percentage scoring analysis, principal component analysis (PCA) and eigenvalues were used to elaborate on clustered factors. Findings The research conceptualised LeanIPD&GID principles and proposed GID strategy placements for LeanIPD&GID transformative initiatives and FOW global initiatives. It concluded that the most significant barriers to integration of LeanIPD&GID on CMPs are “lack of mandatory building information modelling (BIM) and LC industry standards and regulations by governments”, “lack of involvement and support of governments”, “high costs of BIM software licenses”, “resistance of industry to change from traditional working practices” and “high initial investment in staff training costs of BIM”. PCA revealed the most significant FCs are “education and knowledge-related barriers”, “project objectives-related barriers” and “attitude-related barriers”. Awareness of BIM in the Middle East and North Africa (MENA) region is higher than LC and LC awareness is higher than IPD knowledge. Whilst BIM adoption in the MENA region is higher than LC; the second is still taking its first steps, whilst IPD has little implementation. LeanBIM is slightly integrated, whilst LeanIPD integration is almost not present. Originality/value The research findings, conclusion and recommendation and proposed GID strategy placements for LeanIPD&GID transformative initiatives to integrating LeanIPD&GID on CMPs. This will allow project key stakeholders to place emphasis on tackling LeanIPD&GID barriers identified in this research and commence GID strategies. The study has provided effective practical strategies for enhancing the integration of LeanIPD&GID transformative initiatives on CMPs.

Publisher

Emerald

Subject

General Engineering

Reference107 articles.

1. A critical analysis of building information modelling systems used in construction projects;Advances in Engineering Software,2015

2. Metric-based BIM implementation assessment: a review of research and practice;Architectural Engineering and Design Management,2017

3. The impact of building information modelling (BIM) maturity and experience on contractor absorptive capacity;Architectural Engineering and Design Management,2018

4. Contractors’ transformation strategies for adopting building information modeling;Journal of Management in Engineering,2016

5. AIA/AIA CC American Institute of Architects and AIA California Council (2007), “Integrated project delivery: a guide”, available at: www.aia.org/resources/64146-integrated-project-delivery-a-guide.pdf (accessed 8 February 2021).

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3