Author:
Agyekum Kofi,Adinyira Emmanuel,Amudjie Judith
Abstract
Purpose
The purpose of this paper is to examine the views of construction practitioners on the prevalence of ethical misconduct within the invitation to tender and tender evaluation and award stages of construction contracts in Ghana.
Design/methodology/approach
Following a critical comparative review of literature resulting in the identification of 18 potential misconducts within the invitation to tender and 11 potential misconducts within the tender evaluation and award stages of construction contracts, a questionnaire survey was conducted among 65 construction professionals. Data obtained from the survey were analysed using both descriptive (i.e. frequencies, mean scores and standard deviations) and inferential statistics (paired t-test), followed by gap analysis.
Findings
The findings revealed that corrupt, fraudulent, collusive or coercive practices, client divulging more information to the preferred bidder and inflating tender prices by tenderers in return for kickbacks are key unethical practices prevalent at the invitation to tender stage. Following these key unethical practices, the findings further suggested through gap analysis that submission of bids on non-working days and inadequate time for preparation and submission of tenders were the top two unethical practices that needed serious interventions at this stage. At the tender evaluation and award stage, the findings revealed that interference by influential people in political positions, fake tendering and bid shopping are prevalent. Again, from the gap analysis, interference by influential people in political positions and poor definition of selection criteria were identified to be the two key unethical practices that need urgent intervention at this stage of construction contracts.
Practical implications
This study holds a significant practical implication in the sense that key unethical practices at the invitation to tender and tender evaluation and award stages of construction contracts have been identified, and this provides a suitable basis for stakeholders that spearhead such activities to offer suitable interventions to control such practices.
Originality/value
This study contributes to the body of knowledge as it uncovers ethical misconducts within two important phases of construction contracts in a developing country setting. As there is a continuous effort by the international community towards finding lasting solutions to such misconducts, the findings from this study can be used as a starting point for appropriate policies to be put in place in Ghana to control such misconducts.
Reference68 articles.
1. How professional ethics impact construction quality: perception and evidence in a fast-developing economy;Scientific Research and Essays,2010
2. Curbing unethical practices associated with preferential allocation of construction contracts in Ghana: survey professionals’ perception of who should lead the way,2018
3. Ethical issues in the construction industry: contractor’s perspective;Procedia-Social and Behavioural Sciences,2012
4. Factors driving the adoption of green certification of buildings in Ghana;Smart and Sustainable Built Environment,2020
5. Factors influencing the performance of safety programmes in the ghanaian construction industry;Acta Structilia,2018
Cited by
7 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献