1. Akintoye, A. (1995), “Just‐in‐Time application and implementation for building material management”, Construction Management and Economics, Vol. 13 No. 2, pp. 105‐113.
2. Baldwin, A., Poon, C., LY, S., Austin, S. and Wong, I. (2009), “Designing out waste in high‐rise residential buildings: analysis of precasting methods and traditional construction”, Renewable Energy, Vol. 34 No. 9, pp. 2067‐2073.
3. Cooke, B. and Williams, P. (2009), Construction Planning, Programming and Control, 3rd ed., Wiley‐Blackwell Publishing, Oxford.
4. Cooper, R., Aouad, G., Lee, A.S W., Fleming, A. and Kagioglou, M. (2005), Process Management in Design and Construction, Blackwell Publishing, Oxford.
5. Craighall, A. and Powell, J. (1999), “A lifecycle assessment and evaluation of construction and demolition waste”, CSERGE Working Paper, Centre for Social and Economic Research on the Global Environment, pp. 99‐103.