Cost analysis error? Exploring issues relating to whole-life cost estimation in sustainable housing

Author:

Sloan Brian,Tokede Olubukola,Wamuziri Sam,Brown Andrew

Abstract

Purpose – The main purpose of the study is to promote consideration of the issues and approaches available for costing sustainable buildings with a view to minimising cost overruns, occasioned by conservative whole-life cost estimates. The paper primarily looks at the impact of adopting continuity in whole-life cost models for zero carbon houses. Design/methodology/approach – The study embraces a mathematically based risk procedure based on the binomial theorem for analysing the cost implication of the Lighthouse zero-carbon house project. A practical application of the continuous whole-life cost model is developed and results are compared with existing whole-life cost techniques using finite element methods and Monte Carlo analysis. Findings – With standard whole-life costing, discounted present-value analysis tends to underestimate the cost of a project. Adopting continuity in whole-life cost models presents a clearer picture and profile of the economic realities and decision-choices confronting clients and policy-makers. It also expands the informative scope on the costs of zero-carbon housing projects. Research limitations/implications – A primary limitation in this work is its focus on just one property type as the unit of analysis. This research is also limited in its consideration of initial and running cost categories only. The capital cost figures for the Lighthouse are indicative rather than definitive. Practical implications – The continuous whole-life cost technique is a novel and innovative approach in financial appraisal […] Benefits of an improved costing framework will be far-reaching in establishing effective policies aimed at client acceptance and optimally performing supply chain networks. Originality/value – The continuous whole-life costing pioneers an experimental departure from the stereo-typical discounting mechanism in standard whole-life costing procedures.

Publisher

Emerald

Subject

Economics and Econometrics,Finance,Accounting,Business and International Management

Reference44 articles.

1. Assaf, S. , Al-Hammad, A. , Jannadi, O. and Saad, S. (2002), “Assessment of the problems of application of life cycle costing in construction projects”, Cost Engineering , Vol. 44 No. 2, pp. 17-22.

2. Ayyub, B. (1999), Uncertainty Modelling and Analysis in Civil Engineering , CRC Press, Boca Raton, FL.

3. Boardman, B. (2007), “Examining the carbon agenda via the 40% house scenario”, Building Research and Information , Vol. 35 No. 4, pp. 363-378.

4. Boermans, T. , Bettgenhauser, K. , Hermelink, A. , Schimschar, S. and other Ecofys International Staff (2011), “Cost optimal building performance requirements – calculation methodology for reporting on national energy performance requirements on the basis of cost optimality within the framework of the EPBD”, European Council for Energy Efficient Economy, Stockholm.

5. Boussabaine, A. and Kirkham, R. (2008), Whole Life-Cycle Costing: Risk and Risk Responses , Blackwell, Oxford.

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Life Cycle Costing: Evaluate Sustainability Outcomes for Building and Construction Sector;Industry, Innovation and Infrastructure;2021

2. Cost overruns – helping to define what they really mean;Proceedings of the Institution of Civil Engineers - Civil Engineering;2018-05-01

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3