1. Alder, P.S. (1995), “From project to process management: an empirically based framework for analyzing product development time”, Management Science, Vol. 4 No. 3, pp. 458‐84.
2. Ali, A., Krapfel, R. Jr and LaBahn, D. (1995), “Product innovativeness and entry strategy: impact on cycle time and break‐even time”, Journal of Product Innovation Management, Vol. 12 No. 1, pp. 54‐69.
3. Ancona, D.G. and Caldwell, D.F. (1992), “Demography and design: predictors of new product team performance”, Organization Science, Vol. 3, pp. 321‐41.
4. Anderson, J.C. and Gerbing, D.W. (1988), “Structural equation modeling in practice: a review and recommended two‐step approach”, Psychological Bulletin, Vol. 103 No. 3, p. 411.
5. Babu, A.J.G. and Suresh, N. (1996), “Project management with time, cost, and quality considerations”, European Journal of Operational Research, Vol. 88 No. 2, pp. 320‐7.