Development of an optimized maintenance scheduling for emergency rescue railway wagons using a genetic algorithm: a case study of Iran railways company

Author:

Zavareh Ali,Fallahiarezoudar EhsanORCID,Ahmadipourroudposht Mohaddeseh

Abstract

PurposeThis paper aims to optimize the maintenance scheduling of emergency rescue wagons in railway companies using a genetic algorithm (GA). It offers an integrated model for simultaneously solving maintenance planning, preventive maintenance, prognostic information and resource planning from which optimal levels of the system performance in terms of cost and repair time could be determined.Design/methodology/approachThis study initially evaluates the previous types of research in presenting the optimal model of the rescue train wagon for maintenance and repair planning and lists the identified criteria based on experts' opinions using fuzzy analytic hierarchy process (FAHP) and stepwise weight assessment ratio analysis (SWARA) techniques. Then, the final weight of the desired criteria is calculated. Later, the final decision matrix is evaluated by the experts. The final normal decision matrix is formed to select the optimal maintenance and repair planning plan based on the GA. Finally, two strategies including joint optimization strategy of preventive maintenance planning are compared with the independent preventive maintenance planning strategy.FindingsAccording to the primary results, three primary parameters, including technology, human damage caused by negligence and the average failure rate, should be considered for launching the GA model. Based on the results of the second part; by comparing the preventive maintenance planning strategy independently, the joint optimization strategy reduces the total cost of production up to 8.25%. Comparison results show that the total cost of joint optimization production is less than independent preventive maintenance and repair planning. Moreover, the value of total process time in joint optimization strategy was reduced by 1.2% compared to independent preventive maintenance (PM) planning (from 137.90 to 136.20 h).Originality/valueThe novelty of this paper lies on the application of the GAs to develop an optimized PM scheduling to localize the maintenance planning for maximizing productivity, avoid train accidents, reduce costs and increase efficiency and capacity.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3