A risk-oriented tender evaluation system for construction projects in Malaysia

Author:

Ismail Mohd Razali,Sun Ming,Bowles Graeme

Abstract

PurposeThis paper presents results of an empirical investigation involving private construction clients in Malaysia, which seeks to establish appropriate tender evaluation criteria and weightings for a risk-oriented tender evaluation system.Design/methodology/approachAt the initial stage of this study, a list of significant risks is identified and gathered through literature review. These risks are then mapped onto tender evaluation criteria. Following this, the identified risks and their mappings are validated through a questionnaire survey to determine appropriate criteria for tender evaluation. Weightings for the selected evaluation criteria are established through an analytic hierarchy process (AHP) group decision-making (GDM) method.FindingsIn practice, different lists of criteria, covering tender's technical capability and financial performance, are often used by different client organisations. However, there is a paucity of research behind the selection of these criteria and the weighting being attributed to different criteria.Originality/valueThis study provides an important and a valuable insight into the actual criteria used during tender evaluation practice based on an analysis of documentary evidence. Both current practice and existing tender evaluation studies failed to address the risk element adequately. There is a lack of an explicit link between evaluation criteria and project risks. This study fills this knowledge gap by identifying tender evaluation criteria through reviewing criteria used in practice and examining their links to risk factors.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference87 articles.

1. Significant risk factors in construction projects: Contractor’s Perception, Humanities, Science and Engineering (CHUSER),2012

2. Procedures for synthesizing ratio judgements;Journal of Mathematical Psychology,1983

3. A survey of current cost estimating practices in the UK;Construction Management and Economics,2000

4. Application of the AHP in project management;International Journal of Project Management,2001

5. The significant factors causing delay of building construction projects in Malaysia;Engineering Construction and Architectural Management,2007

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3