Investigating the factors affecting construction site productivity – a case of India

Author:

Vigneshwar R.V.K.ORCID,Shanmugapriya S.

Abstract

PurposeProper prediction of productivity can enable the enhanced estimation, realistic scheduling, and accurate cost forecasting of construction processes. Due to the existence of different labor sources (unionized and non-unionized), the prediction of productivity is still a significant problem in India. Moreover, the construction procurement processes and on-site performance are the predominant elements that can result in improved project outcomes. Thereby, the consideration of labor constraints and site conditions will play an important role in productivity improvement.Design/methodology/approachThis study investigates the factors affecting construction site productivity. A total of 28 factors are grouped under 7 categories as follows: labor constraints, safety and quality procurements, material and equipment (ME), site management, project working condition, delay controls, construction methods and techniques, and external factors. Furthermore, by involving these factors, the questionnaire survey was conducted among Indian construction practitioners. As a result, 204 responses were received and the data were analyzed using a reliability test, relative importance index (RII), and analysis of variance (ANOVA).FindingsThe result of this study highlighted the importance of strategic construction management activities in terms of effective planning of ME, planning and realistic scheduling of construction activities, proper communication, information sharing, etc. Thus, this study provides a clear insight to the Indian construction practitioners in determining the effect of these site factors on the successful execution of their projects.Originality/valueIn this paper, the problem of construction productivity in India and its causes are explained effectively. This study examines the preference of labor contract, labor source, and most importantly, the factors affecting site productivity. Moreover, the other lagging issues regarding the management of construction activities are also described in detail.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference91 articles.

1. Factors affecting construction labour productivity for Malaysian residential projects;Structural Survey,2005

2. Identifying factors affecting construction labour productivity in India and measures to improve productivity;Asian Journal of Civil Engineering,2020

3. Swot analysis of arbitration awards in Indian construction contracts;International Journal of Civil Engineering and Technology,2017

4. Job assignment based on brain demands and human resource strategies;Journal of Construction Engineering and Management,2017

5. Factors affecting the productivity of building craftsmen - studies of Uganda;Journal of Civil Engineering and Management,2007

Cited by 2 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3