An integrated risk assessment method for cross-regional mega construction projects

Author:

Xiang Pengcheng,Xia Xin,Pang Xianya

Abstract

PurposeThe purpose of this paper is to develop a novel integrated risk assessment method from the system perspective to evaluate the risk of the cross-regional mega construction project (CMCP). Furthermore, this paper aims to confirm the core risk source factors and refine the risk management strategies of CMCPs through a case study.Design/methodology/approachBased on the analysis of the risk system of CMCPs, the concept model and risk assessment principles of integrated risk assessment were confirmed. The risk source factors and project objectives of the CMCP were identified from a literature review, export interview and case analysis. According to the vulnerability theory, the integrated risk assessment model was developed by involving vulnerabilities, threats, objectives and interaction of those factors synthetically. Then, ZW high-speed railway from China was analyzed to verify the feasibility and effectiveness of the proposed method.FindingsAs a result, 12 threat factors and 12 vulnerability factors were identified. Based on the case study, the main external threat comes from T13 (conflicts of interest between local governments) and T23 (harsh natural environment); the most easily exploited internal vulnerabilities were V11 (complexity of technology), V13 (lack of experience in technical application), V21 (inadequate experience) and V23 (lack of interest coordination mechanism). Moreover, the economic objective was most affected.Practical implicationsIt is essential to develop an interest coordination mechanism for CMCPs. The harsh natural environment is a critical factor, but it also promotes technological innovation and iteration. Public opinions in different regions are critical for CMCPs, and more emphasis should be placed on public opinion surveys of CMCPs. Moreover, diverse and flexible environmental protection strategies should apply in CMCPs.Originality/valueThis research has the following three contributions. First, based on vulnerability theory, an integrated risk assessment approach of CMCPs is developed, which enriches the risk measurement method system and provides inspiration for future research on risk in the construction industry. Second, the risk sources of CMCPs are identified from the perspective of vulnerability and threat to provide clear guidance for the risk management of CMCPs. Third, the core risk source factors and management strategies confirmed by the case study will be beneficial for various governments in different regions and project managers to optimize the project management scheme, as they are transferable management experiences.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference71 articles.

1. An analytic network process based risk assessment model for ppp hydropower investments;Journal of Civil Engineering and Management,2021

2. Risk management for construction of a mega project in Kuwait,2016

3. Novel approach to satisfying stakeholders in megaprojects: balancing mutual values;Journal of Management in Engineering,2020

4. Risk analysis for information systems;Journal of Information Technology,1992

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3