Abstract
PurposeCompleting construction projects within the planned schedule has widely been considered as one of the major project success factors. This study investigates the use of technologies to address delays in construction projects and aims to address three research questions (1) to identify the adopted technologies and proposed solutions in the literature, (2) to explore the reasons why the delays cannot be prevented despite disruptive technologies and (3) to determine the major strategies to prevent delays in construction projects.Design/methodology/approachIn total, 208 research articles that used innovative technologies, methods, or tools to avoid delays in construction projects were investigated by conducting a comprehensive literature review. An elaborative content analysis was performed to cover the implemented technologies and their transformation, highlighted research fields in relation to selected technologies, focused delay causes and corresponding delay mitigation strategies and emphasized project types with specific delay causes. According to the analysis results, a typological framework with appropriate technological means was proposed.FindingsThe findings revealed that several tools such as planning, imaging, geo-spatial data collection, machine learning and optimization have widely been adopted to address specific delay causes. It was also observed that strategies to address various delay causes throughout the life cycle of construction projects have been overlooked in the literature. The findings of the present research underpin the trends and technological advances to address significant delay causes.Originality/valueDespite the technological advancements in the digitalization era of Industry 4.0, many construction projects still suffer from poor schedule performance. However, the reason of this is questionable and has not been investigated thoroughly.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference91 articles.
1. Combined Discrete-event/continious simulation for project planning;Journal of Construction Engineering and Management,1997
2. A multimedia construction delay management system;Computer-Aided Civil and Infrastructure Engineering,1997
3. Auto-generated site layout: an integrated approach to real-time sensing of temporary facilities in infrastructure projects;Structure and Infrastructure Engineering,2016
4. Construction delay: a quantitative analysis;International Journal of Project Management,2000
5. A web-based information support system for the pre-design phase of public projects;Kuwait Journal of Science and Engineering,2003
Cited by
8 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献