1. Ahmed, S.M., Tang, P., Azhar, S. and Ahmad, I. (2004), An Evaluation of Safety Measures in the Hong Kong Construction Industry Based on Total Quality Management Principals, available at: www.fiu.edu/(sazha002/research/tqm‐paper.pdf (accessed 9 September).
2. Aksorn, T. and Hadikusumo, B.H.W. (2006), “Critical success factors of safety programs implementation in Thai construction projects”, in Fang, D., Choudhry, R.M. and Hinze, J.W. (Eds), Proceedings of the CIB W99 2006 International Conference on Global Unity for Safety and Health in Construction, Beijing, 28‐30 June, Tsinghua University Press, Beijing, pp. 328‐36.
3. Blockley, D. (1995), “Process re‐engineering for safety”, Proceedings of Risk Engineering and Management in Civil, Mechanical and Structural Engineering, 22 February, ICE, London, pp. 51‐66.
4. Chileshe, N. and Watson, P. (2005), “Impact of time lag analysis on TQM implementation within construction related SMEs”, in Hara, T. (Ed.), Proceedings of the 3rd International Conference on Structural and Construction Engineering, Shunan, 20‐23 September, pp. 937‐45.
5. Construction in Hong Kong: Success Factors for ISO9000 Implementation