1. Arafat, G.H., Goodman, B. and Arciszewski, T. (1991), “RAMZES: A knowledge‐based system for structural concepts evaluation”,Artificial Intelligence and Structural Engineering, pp. 113‐19.
2. Bishop, R. (1996), “Value management in UK practice”,Research Focus, No 25, p. 3.
3. Boussabaine, A.H. (2001), “Neurofuzzy modelling of construction projects’ duration I: principles”,ECAM, Vol. 8 No. 2, pp. 104‐13.
4. Estimating Construction Productivity: Neural‐Network‐Based Approach
5. Chen, S.E., McGeorge, D. and Ostwald, M.J. (1993), “The role of information management in the development of a strategic model of buildability”,Proceedings of the MIT‐Construction Conference, Singapore.