Author:
Adeniyi Onaopepo,Thurairajah Niraj,Leo-Olagbaye Feyisetan
Abstract
Purpose
Practitioners have reported a minimal and non-use of building information modelling (BIM), especially in small and medium-sized organisations and BIM infant construction industries. This development calls for a reappraisal of organisations’ strength in capabilities required for BIM uptake towards the target of global construction digitalisation. This study aims to assess the BIM Level 2 uptake capability of organisations in a BIM infant construction industry and identify the underlying interactions between the capability criteria.
Design/methodology/approach
The study used a multivariable analysis of fifteen descriptors identified from the people, process, policy, finance and technology domain. Data collection was done in the BIM infant construction industry in Nigeria. Verification of the descriptors and an evaluation of BIM uptake capability in organisations was done. Seventy-three responses were received within the selected context, and data analysis was done with mean weighting and exploratory factor analysis. Maximum Likelihood extraction and Direct Oblimin rotation were used.
Findings
Factor analysis revealed three factors that explained 53.28% of the total variance in the BIM Level 2 uptake capability of construction organisations. The factors are workforce capacity and continuous development, an affinity for innovation and strength in physical and operational facilities.
Research limitations/implications
This study provides an overarching and insightful discussion on BIM uptake capability and construction digitalisation with evidence from a BIM-infant construction industry.
Practical implications
The findings of this study are a piece of valuable empirical evidence on Level 2 BIM uptake capability. This empirical situation analysis will inform the advocacy for the advancement of BIM and enhanced utilisation of building information. Evidence on the capability performance of the BIM infant industry has been revealed.
Originality/value
The outcome is expected to stir debate on the preparedness of organisations to further exploit the benefits of BIM in the BIM infant construction industry. Examination of the capability for a particular phase of BIM is scanty in the literature.
Subject
Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering
Reference89 articles.
1. Adeshina, A. (2021), “Nigeria – country commercial guide – construction sector”, www.trade.gov/country-commercial-guides/nigeria-construction-sector (accessed 29 May 2022).
2. A unified BIM adoption taxonomy: conceptual development, empirical validation, and application;Automation in Construction,2018
3. Barriers to bond financing for public-private partnership infrastructure projects in emerging markets: a case of Nigeria;Journal of Financial Management of Property and Construction,2017
4. Barriers to BIM implementation and ways forward to improve its adoption in the Nigerian AEC firms;International Journal of Building Pathology and Adaptation,2020
5. An investigation into BIM uptake among contracting firms: an empirical study in Nigeria;Journal of Financial Management of Property and Construction,2020
Cited by
10 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献