SOME HEURISTICS FOR THE DISCRETE TIME‐PROPORTIONAL DEMAND INVENTORY PROBLEM
Author:
Arcelus F.J.,Srinivasan G.
Abstract
This paper develops heuristics for the discrete‐time‐proportional demand inventory problem. In addition to the traditional minimal cost objective, return on investment in inventory is proposed as an alternative criterion in capital constrained situations. The resulting heuristics can be implemented with little computational effort. Moreover, the policies associated with the general inventory cases are independent of the length of the planning horizon. Some computational experience is also reported.
Subject
Computer Science (miscellaneous),Social Sciences (miscellaneous),Theoretical Computer Science,Control and Systems Engineering,Engineering (miscellaneous)
Cited by
1 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献