1. Atwater, J.B. and Chakravorty, S.S. (1994), “Does protective capacity assist managers in competing along time‐based dimensions”,Production and Inventory Management Journal, Vol. 35, pp. 53‐9.
2. MRP performance effects due to lot size and planned lead time settings
3. Frizelle, G., Mcfarlane, D. and Bongaerts, L. (1998), “Disturbance measurement in manufacturing production systems”,Proceedings of the Advanced Summer Institute of the Esprit Network of Excellence in Intelligent Control and Integrated Manufacturing Systems, Bremen, 14‐17 June, pp. 159‐62.
4. Gindy, N. (1998), “Responsive manufacturing”,Assembly Automation, p. 18.
5. A simulation-based experimental investigation of supply/timing uncertainty in MRP systems