Author:
Ghansah Frank Ato,Owusu-Manu De-Graft,Ayarkwa Joshua,Edwards David John,Hosseini M. Reza
Abstract
Purpose
While smart building technologies (SBTs) implementation ensures sustainability, their adoption is hampered by latent barriers, especially in project management processes. These latent barriers must be addressed to facilitate the successful and widespread adoption of SBTs. Therefore, this study aims to explore the significant latent barriers inhibiting the project management processes in adopting SBTs in developing countries.
Design/methodology/approach
A positivist research philosophy couched within a deductive approach was adopted to undertake a quantitative questionnaire survey of 227 project management and design team participants. Descriptive and inferential analytical tools (including a one sample T-test and exploratory factor analysis) were then adopted to interpret data collected.
Findings
The results reveal that the “high cost of smart sustainable materials and equipment” is the major significant barrier hindering the adoption of SBTs in developing countries. Latent barriers were: “structure and time-related barriers,” “construction-related barriers” and “human, policy and cost-related barriers”.
Originality/value
The study contributes novel insights into the prevailing nascent discourse on SBTs from the perspectives of construction project managers and design teams in developing countries, particularly. Furthermore, to the best of the authors’ knowledge, this is the first study that ascertains the significant barriers inhibiting project management processes in adopting SBTs in developing countries.
Subject
Building and Construction,Architecture,Civil and Structural Engineering,General Computer Science,Control and Systems Engineering
Cited by
14 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献