Cost and time performance analysis of progressive design-build projects

Author:

Adamtey Simon

Abstract

Purpose The purpose of this paper is to investigate and determine the time and cost performance of progressive design-build (PDB) projects compared with that of design-build (DB) projects. The objective is to provide empirical evidence on the performance of PDB delivery method. Design/methodology/approach A quantitative research approach was used by analyzing time and cost data collected on 75 PDB and 92 DB projects from the database of Design-Build Institute of America. One-way analysis of variance was used to determine statistical difference in time and cost performance between PDB and DB. Findings PDB projects have a comparatively better time performance than cost performance. When compared with DB projects, there was a statistically significant difference in time overrun with PDB performing better than DB (0.41 vs 8.0%). Additionally, about 80% of PDB projects had shorter or as scheduled duration compared to 74% for DB. There was no statistically significant difference of cost performance between PDB and DB. Research limitations/implications The main limitation is the sample size of 72 PDB projects. It is recommended that further research should be conducted using a larger sample size to confirm the findings of this study. Practical implications PDB will be more beneficial for projects with sensitive deadlines. For an owner deciding between PDB and DB, the advantage of using PDB is in its time performance, which may lead to the project being completed on or ahead of time. As such, PDB can serve as another “tool in the toolbox” for owners to help in reducing construction delays. Originality/value This paper is the first attempt to provide an empirical evidence of the cost and time performance of PDB based on analyzing multiple projects. Owners will be better informed when selecting PDB for their projects.

Publisher

Emerald

Subject

General Engineering

Reference31 articles.

1. Challenges of implementing progressive design-build in highway construction projects;Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,2020

2. Arcadis (2016), “Global construction disputes report”, available at: www.arcadis.com/media/B/1/5/%7BB15A64ED-8DB6-4202-AD50-D086DA63496C%7DGlobal%20Construction%20Disputes%20Report%202016_NEW.pdf, (accessed 2 March 2020).

3. Time and cost performance of design–build projects;Journal of Construction Engineering and Management,2015

4. Choosing appropriate contract methods for Design-Build projects;Journal of Management and Engineering,2015

Cited by 6 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Implementation of Progressive Design-Build in Airport Capital Construction Projects;Transportation Research Record: Journal of the Transportation Research Board;2024-05-23

2. Restoration manager: Adapting project delivery methods for the restoration of architectural heritage;Turkish Journal of Engineering;2024-04-30

3. Data-Driven Analysis of Progressive Design Build in Water and Wastewater Infrastructure Projects;Journal of Construction Engineering and Management;2024-01

4. Project time performance: Is technology relevant?;INTERNATIONAL CONFERENCE ON MECHANICAL MATERIALS AND RENEWABLE ENERGY (ICMMRE 2022);2023

5. How to alter path dependency and promote the use of EPC model in public projects of China?;PLOS ONE;2022-04-19

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3