Risk factors in oil and gas construction projects in developing countries: a case study

Author:

A. Kassem Mukhtar,Khoiry Muhamad Azry,Hamzah Noraini

Abstract

Purpose This study aims to investigate the risk factors in construction projects in oil and gas processing facilities in Yemen and serves as a case study for developing countries. Design/methodology/approach By using a questionnaire, data were collected from 201 project managers and engineers employed in different sectors in the oil and gas industry in Yemen. Findings The survey analysis based on Kruskal–Wallis test method shows a high degree of agreement on the perceptions of risk factors depending on categories of companies. In other words, the tested risk factors exist in all sectors of oil companies in Yemen and are valid as a measure of risk factors in construction projects in oil and gas organizations in general. Although no evidence suggests that the risk factors differ significantly according to job title, the result of identifiable risk factors according to experience shows a statistically significant difference among participants in terms of their experience. The relative importance of the ranking of risk factors was obtained by the statistical analysis of responses on the impact and likelihood of occurrence of these risks. Findings show that internal risks are the greatest influential factors in construction projects in the oil and gas sector, followed by changes during construction project, government instability, incorrect project cost estimation, government delay in decision making, incorrect project schedule estimation, and political situation and war in the country. Originality/value These findings are valuable to organizations that are planning to conduct construction projects for oil and gas processing facilities in Yemen and other nations with similar environments, such as developing countries.

Publisher

Emerald

Subject

Strategy and Management,General Energy

Reference49 articles.

1. Risk analysis for the major factors affecting the construction industry in Jordan;Emirates Journal for Engineering Research,2005

2. Risk impact assessments in project budget development: quantity surveyors’ perspectives;International Journal of Construction Management,2018

3. Challenges of mega construction projects in developing countries;Organization, Technology and Management in Construction,2013

4. Risk analysis and management in construction;International Journal of Project Management,1997

5. The significant factors causing delay of building construction projects in Malaysia;Engineering, Construction and Architectural Management,2007

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3