Examining project learning, project management competencies, and project efficiency in project-based firms (PBFs)

Author:

Mainga Wise

Abstract

Purpose The purpose of this paper is to use survey data to rank the relative importance of perceived factors that inhibit the transfer of knowledge across projects and examine the statistical relationship between various “higher order” dimensions of project management competencies and project efficiency among a sample of project-based firms (PBFs). Design/methodology/approach The research philosophical approach adopted was post-positivism, a half-way house between positivism and phenomenological approaches. The author used a largely structured survey questionnaire with an inclusion of few open-ended items. The survey data collected were largely based on the “perceptions” of mostly experienced project management practitioners, whose perspectives on project processes and performance are likely to be more dependable. Because of budget limitations, a total of 260 questionnaires were mailed to randomly selected PBFs (with an enclosed self-addressed and stamped return envelope). Of the 260 questionnaires sent to PBFs, 58 questionnaires were returned, representing a return rate of just over 22 percent. Findings Results indicate that “high time pressures towards the end of the project,” “too much focus on short-term project deliverables,” and “fear of negative sanctions when disclosing project mistakes” were three top-ranked factors that inhibited knowledge transfer across projects. Some “higher order” project management competencies like “dynamic competencies” have relatively a greater impact on predicting project efficiency. Dynamic competencies will only continue to increase in importance as today’s project environments are characterized as continuously evolving, turbulent, and complex and require the need to be effective in dealing with various uncertainties. Once included in the regression equation, the “ownership variable” dominates all other explanatory variables in predicting project efficiency among a sample of PBFs in the United Arab Emirates (UAE), most likely driven by the project management competencies of multinational corporations (MNCs). However, the project efficiency of state-owned PBFs did not differ significantly from that of “international firms that were not MNCs.” Specific conditions may have led to such an outcome. The author shows that enhancing project efficiency requires the reinforcement of multiple but specific factors. Research limitations/implications As the study was largely conducted on a limited budget and time frame, the author was not able to employ a multi-method approach. The inclusion of a few case studies would have facilitated triangulation of the current findings. In addition, the study captures “perceptions” and practical experiences of project management practitioners. Future studies could possibly develop what may be seen as “objective” measures of project learning and project management competencies. A larger survey supported by a larger budget would be one option in which some of the findings could be tested across PBFs located in different sectors and countries. Practical implications The author argues that the creation of a client-led “no-blame culture” within PBFs can ensure the development of a “safe” environment in which project team members can acknowledge project mistakes without the fear or danger(s) that may come with such admission. This may require changes in project organizational culture that reduces power distance, lowers sensitivity to hierarchal power relations, enhances team building efforts, and fosters a “learning climate” that tolerates “trial and error” experimentation. It may also require strengthening clients’ specific capabilities. Such change may require time and patience but could take advantage of “positive” aspects of participatory practices, personal relationships, and consensus decision-making approach that is prevalent in the UAE culture. One managerial implication points to the need to tailor scarce resources in building up multi-dimensional “higher order” competencies like “dynamic competencies” that have a relatively higher significant impact on enhancing project efficiency. Linking MNCs with local PBFs as collaborative mega project delivery partners may lead to enhancing project management competencies of the latter, conditional on their absorptive capacity. Originality/value The contribution of the paper is in providing survey-based empirical evidence that goes beyond case studies to highlight the importance of enhancing “higher order” project management competencies, such as “dynamic competencies,” that have a stronger predictive power of project efficiency in PBFs. The study also ranks the relative importance of various factors that inhibit the transfer of new knowledge across projects. To the author’s knowledge, this is the first study that has demonstrated the statistical relationship between “higher order” project management competencies and project efficiency. Project efficiency is a multi-faceted construct. Its strengthening is determined by a configuration of multiple but specific factors. A more “nuanced” understanding of the relationship between project management competencies and project efficiency in a particular context may be required.

Publisher

Emerald

Subject

Strategy and Management,Business and International Management

Reference216 articles.

1. Preparing project based organizations for change;Procedia Technology,2013

2. Developing ‘Owner Project Capabilities’ for public sector clients delivering infrastructure projects: a dynamic capabilities approach,2016

3. Knowledge formation and learning in the management of projects: a problem solving perspective;International Journal of Project Management,2014

4. Cultural impacts on knowledge management and learning in project-based firms;VINE: The Journal of Information Knowledge Management Systems,2009

5. Al Ahbabi, M.S. (2014), “Process protocol for the implementation of integrated project delivery in the UAE: a client perspective”, PhD thesis, School of Built Environment, University of Salford, Salford, available at: http://usir.salford.ac.uk/31870/1/PROCESS_PROTOCOL_FOR_THE_IMPLEMENTATION_OF_INTEGRATED_PROJECT_DELIVERY_IN_THE_UAE.pdf (accessed December 5, 2016).

Cited by 32 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3