Author:
Callarman Thomas E.,Hamrin Robert S.
Abstract
Much has been published in the production and operations management literature regarding the performance of lot sizing rules in Material Requirements Planning (MRP). Most of this literature has been concerned with performance of these rules in a deterministic environment. In this research, the authors add uncertain demand and compare the performance of three lot sizing techniques. These techniques are economic order quantity, part‐period balancing and Wagner‐Whitin. Performance is compared using total inventory cost and computer time as criteria. In this research with stochastic demand, part‐period balancing proves to be the best lot sizing rule, overall. In many of the 128 problems generated, part‐period balancing and Wagner‐Whitin are very close to equal on total cost, but part‐period balancing uses far less computer time. Also included in the results is a discussion of particular situations where each of the lot sizing rules works best.
Subject
Management of Technology and Innovation,Strategy and Management,General Decision Sciences
Cited by
23 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献