Validation of an integrated influential factors (IIFs) model as a panacea to curb projects completion delay in Yemen

Author:

Al-Fadhali Najib,Mansir Dodo,Zainal Rozlin

Abstract

Purpose Influential factors attributed to causing project completion delay (PCD) differ because of prevailing variability of local conditions. Construction projects specifically in Yemen (and other developing countries) experience devastating effects of PCD which include litigation, cost overrun, arbitration, abandonment and failure. While existing works have investigated the causes and effects of PCD, not much exist on approaches to optimizing its occurrence in Yemen. In a bid to enhance the effects of PCD in Yemen, the integrated influential factors (IIFs), which is a construction-party specific model, was developed to mitigate the effects of PCD in Yemen. As a build up to the development of this model, this paper aims to validate the IIFs model with a view to foster its application to enhance PCD in construction project delivery in Yemen. Design/methodology/approach The validation of the IIFs model was done through seeking the opinions of 12 selected construction industry experts. This involved using a structured questionnaire to seek information on the sustainability of implementing the IIFs model. Findings The findings revealed that if the IIFs model is vigorously implemented, it would go a long way in curbing delay in the delivery of construction projects, making construction delivery less risky due to the effects of delay. Research limitations/implications The study is limited to only influential factors of internal stakeholders of the construction phase. Similarly, the study was only conducted in the state of Sana'a, Yemen. The implication of the adoption of the IIFs model is that it can hopefully serve as an adaptive controller to construction project delivery relative to the specific parameters and factors investigated in this study. Originality/value The IIFs model is a novel approach to optimizing PCD in Yemen specific to both the construction-phase and internal stakeholders. Existing studies on PCD in Yemen, although investigating the causes and effect of PCD, hardly proffer any approach to optimizing PCD for successful construction project delivery.

Publisher

Emerald

Reference56 articles.

1. Delay and cost overrun in infrastructure projects in Jordan;Procedia Engineering,2017

2. Determining critical success factors of project management practice: a conceptual framework;Procedia – Social and Behavioral Sciences,2014

3. A framework for identifying causal factors of delay in nuclear power plant projects;Procedia Engineering,2016

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3