Author:
Babatunde Solomon Olusola,Perera Srinath,Zhou Lei,Udeaja Chika
Abstract
Purpose
– The purpose of this paper is to identify and assess the perceptions of stakeholders on critical success factors (CSFs) for Public Private Partnership (PPP) projects in Nigeria.
Design/methodology/approach
– A comprehensive literature review was conducted to identify the CSFs for PPP projects, which were employed to design a questionnaire survey. In order to capture a broad perception of stakeholders, the questionnaires were administered to five different stakeholder organisations involved in different PPP projects implementation in Nigeria. Data collected were analysed using descriptive statistics, mean score, Kruskal-Wallis test, analysis of variance (ANOVA), and factor analysis.
Findings
– The study revealed the result of mean score ranking, which indicated that all the stakeholders considered the identified 26 CSFs important and crucial for the successful implementation of PPP projects in Nigeria. Thus, the results of Kruskal-Wallis test and ANOVA indicated that except for six (out of 26) identified CSFs, there is no statistically significant difference in the perceptions of the stakeholders on CSFs for PPP projects in Nigeria. The study, through factor analysis, grouped the 26 identified CSFs into six principal factors.
Practical implications
– This research would be of benefit to stakeholders in PPPs to be aware of CSFs that demand utmost consideration. Also the identified CSFs are expected to enhance the success rate of PPP projects.
Originality/value
– The findings would be useful for PPP stakeholders in making decisions and in implementing PPP projects towards achieving value for money. This research will also be of interest to other academic researchers intending to investigate CSFs for PPP projects in other locations.
Subject
Management Science and Operations Research,Civil and Structural Engineering
Reference38 articles.
1. Adeniyi, O.
,
Aje, I.O.
and
Ogunsemi, D.R.
(2011), “Strengths, weaknesses, opportunities, and threats for public-private partners in infrastructure delivery in Nigeria”,
Journal of Construction Project Management and Innovation
, Vol. 1 No. 2, pp. 130-154.
2. Akintoye, A.
and
Liyanage, C.
(2011), “Public private partnerships”, Proceedings of the CIB TG72/ARCOM Doctoral Research Workshop, University of Central Lancashire, Preston, 12 October.
3. Askar, M.M.
and
Gab-Allah, A.A.
(2002), “Problems facing parties involved in build, operate, and transfer projects in Egypt”,
Journal of Management in Engineering
, Vol. 18 No. 4, pp. 173-178.
4. Babatunde, S.O.
,
Opawole, A.
and
Akinsiku, O.E.
(2012), “Critical success factors in public-private partnership (PPP) on infrastructure delivery in Nigeria”,
Journal of Facilities Management
, Vol. 10 No. 3, pp. 212-225.
5. Badu, E.
,
Edwards, D.J.
,
Owusu-Manu, D.
and
Brown, D.M.
(2012), “Barriers to the implementation of innovative financing (IF) of infrastructure”,
Journal of Financial Management of Property and Construction
, Vol. 17 No. 3, pp. 253-273.
Cited by
48 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献