Purpose
Building information modelling (BIM) creates a golden thread of information of the facility, which proves useful to those with the malicious intent of breaching the security of the facility. A cyber-attack incurs adverse implications for the facility and its managing organisation. Hence, this paper aims to unravel the impact of a cybersecurity breach, by developing a BIM-facilities management (FM) cybersecurity-risk-matrix to portray what a cybersecurity attack means for various working areas of FM.
Design/methodology/approach
This study commenced with exploring cybersecurity within various stages of a BIM project. This showcased a heightened risk of cybersecurity at the post-occupancy phase. Hence, thematic analysis of two main domains of BIM-FM and cybersecurity in the built environment led to the development of a matrix that illustrated the impact of a cybersecurity attack on a BIM-FM organisation.
Findings
Findings show that the existing approaches to the management of cybersecurity in BIM-FM are technology-dependent, resulting in an over-reliance on technology and a lack of cybersecurity awareness of aspects related to people and processes. This study sheds light on the criticality of cyber-risk at the post-occupancy phase, highlighting the FM areas which will be compromised as a result of a cyber-attack.
Originality/value
This study seeks to shift focus to the people and process aspects of cybersecurity in BIM-FM. Through discussing the interconnections between the physical and digital assets of a built facility, this study develops a cyber-risk matrix, which acts as a foundation for empirical investigations of the matter in future research.
Subject
Management of Technology and Innovation,Strategy and Management,Business and International Management
Reference141 articles.
1. Automated cost analysis of concept design BIM models,2011
2. Cognitive cybersecurity for CPS-IoT enabled healthcare ecosystems,2019
3. AEC (UK) BIM protocol v2.0 – Implementing UK BIM standards for the architectural, engineering and construction industry;AEC (UK) Committee,2012
4. BIM-based end-of-lifecycle decision making and digital deconstruction: literature review;Sustainability (Switzerland),2020
5. Integrating and visualizing maintenance and repair work orders in BIM: lessons learned from a prototype,2011
Cited by
6 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献