Optimization of reliability and maintenance of liquefaction system on FLNG terminals using Markov modelling

Author:

Gowid Samer,Dixon Roger,Ghani Saud

Abstract

Purpose – The purpose of this paper is to optimize system redundancy and maintenance intervals of a propane pre-cooled mixed refrigerant (C3MR) liquefaction process on floating liquefied natural gas (FLNG) export platforms. Design/methodology/approach – The reliability modeling is based on the time-dependent Markov approach. Four different system options are studied, with various degree of redundancy. Failures in the liquefaction system usually lead to shutdown the whole LNG production plant. The associated shutdown cost is compared with the cost of introducing redundancy and the cost of onboard maintenance. To ensure a high profitability, a model for maintenance optimization is utilized and applied to the main unit of the C3MR liquefaction system to minimize the onboard maintenance cost. Findings – The results indicated that the introduction of a second liquefaction system (as a standby unit) is the best option for liquefaction plant in terms of reliability and cost. This will substantially reduce the unavailability from 14.7 to 2.19 percent of the total operational hours. Based on the presented system configuration, the annual system profit will increase by 180 million USD if the redundancy is implemented on FLNG export ships. The optimum maintenance intervals of major process components are also calculated to minimize the total cost of maintenance. Originality/value – The originality of this paper lies within the context in investigating the reliability of the C3MR liquefaction system on LNG floating export terminals using Markov modeling for the first time.

Publisher

Emerald

Subject

Strategy and Management,General Business, Management and Accounting

Reference27 articles.

1. Andrews, J. and Ericson, C. (2000), “Fault tree and Markov analysis applied to various design complexities”, Proceedings of the 18th International Safety System Conference, Austin, TX, USA.

2. Barclay, M. and Denton, N. (2005), “Selecting LNG offshore processes”, LNG Journal, October, p. -.

3. Bottomley, L. (2002), “FLNG key to global energy supply”, Offshore, Vol. 62, pp. 94-96.

4. Bukowski, J. (2013), “Natural gas liquefaction technology for floating LNG facilities”, paper presented at the 17th International Conference & Exhibition on Liquefied Natural Gas, Houston, TX, USA, April.

5. Castillo, L. and Dorao, C.A. (2013), “On the conceptual design of pre-cooling stage of LNG plants using propane or an ethane/propane mixture”, Energy Conversion and Management, Vol. 65, January, p. -.

Cited by 23 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Decreasing e-waste through reliability enhancement encouraged by performance-based contracting;International Journal of Quality & Reliability Management;2022-02-02

2. Experimental study of condensation heat transfer characteristics on metal foam wrapped tubes under sloshing conditions;International Journal of Heat and Mass Transfer;2021-09

3. Reliability Analysis—A Critical Review;Lecture Notes in Mechanical Engineering;2021-07-24

4. A STRUCTURED FRAMEWORK FOR RELIABILITY AND RISK EVALUATION IN THE MILK PROCESS INDUSTRY UNDER FUZZY ENVIRONMENT;Facta Universitatis, Series: Mechanical Engineering;2021-07-11

5. RAM Analysis of Industrial System of a Chemical Industry;Reliability and Risk Modeling of Engineering Systems;2021

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3