Author:
Backlund Fredrik,Sundqvist Erik
Abstract
Purpose
There are limited studies of continuous improvement (CI) from the perspective of a project-based organization (PBO). Hence, the purpose of this paper is to explore challenges that PBOs may encounter when applying CI.
Design/methodology/approach
An exploratory and qualitative approach has been used, involving six management teams in six different PBOs, using focus groups interviews as data collecting method.
Findings
A high degree of autonomy among project managers seems to limit a collective approach to project management in PBOs. As a consequence the overall PBO performance becomes subordinate to the individual project performance—an approach opposite to that of CI. Further, the management teams themselves seem to uphold a project focus, also complicating improvement initiatives from a PBO-perspective.
Research limitations/implications
The management teams have been the unit of analysis, where the PBOs mainly conduct projects in an engineering and construction context, and are located in the same country and region. This approach enables the thorough study of a phenomenon, while preconditions for generalization are limited. However, the findings could be used by researchers as a basis for more in-depth studies of specific challenges, and for making surveys to obtain generalization of results.
Practical implications
The results can induce awareness and understanding of different challenges if applying CI in a PBO, hence a starting point for finding ways to overcome these challenges.
Originality/value
The article contributes to an increased understanding of challenges that PBOs may encounter when applying CI, confirming and presenting additional findings compared to previous studies.
Subject
Strategy and Management,General Business, Management and Accounting
Reference63 articles.
1. A study of sustainability of continuous improvement in the manufacturing industries in Malaysia;Management of Environmental Quality: An International Journal,2013
2. Project maturity in organisations;International Journal of Project Management,2003
3. Inter‐project improvement in product development;International Journal of Quality & Reliability Management,2005
4. Utilizing Kaizen process and DFSS methodology for new product development;International Journal of Quality & Reliability Management,2017
Cited by
9 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献