Assessment of factors influencing the failure and abandonment of multi-storey building projects in Nigeria

Author:

Adebisi Emmanuel Oluwatobi,Ojo Stephen Okunola,Alao Oluwaseyi Olalekan

Abstract

Purpose The failure and abandonment of construction projects have proven to be insurmountable problems incessantly militating against the efficient performance of the construction industry in Nigeria. The complexity, technicality and a host of other project execution issues unique to multi-storey building projects do increase their susceptibility to failure and abandonment. Thus, the purpose of this paper is to examine the factors influencing failure and abandonment of multi-storey building projects in Nigeria. This is with a view to provide inferential empirical data that could enhance successful delivery of multi-storey building projects in Nigeria. Design/methodology/approach Primary data were used for the study. A structured questionnaire was administered on consultants and contractors’ personnel within Lagos State, Nigeria. A total of 180 copies of the questionnaire were administered ,and 134 copies which represent a combined response rate of 74.4 per cent were retrieved. The data were analysed using frequency distribution and percentages, Mean item score and factor analysis. Findings The factors most significant to the failure and abandonment of multi-storey building projects are inadequate funding by the client, improper planning at the pre-construction phase, structural failure in multi-storey building during construction, bankruptcy/business failure of the contractor, improper scheduling of the building project activities and failure to engage qualified professionals with technical expertise and experience. The rated factors clustered under human resources capability, planning and structural quality, contractor selection and variation, insecurity and variation, and force majeure and political risk. Research limitations/implications The study was limited to multi-storey building projects in Lagos State, Nigeria. Further studies could focus on specific resuscitation strategies for abandoned multi-storey building projects. Practical implications The study provided implications for effective project and contract management of multi-storey building projects which is very paramount to improve the delivery of complex, technical- and capital-intensive building projects in Nigeria. Originality/value The study provides specific implications for the management of multi-storey building projects, thereby enhancing the delivery of building projects.

Publisher

Emerald

Subject

Building and Construction,Civil and Structural Engineering

Reference57 articles.

1. Identification of risks pertaining to abandoned housing projects in Malaysia;Journal of Construction Engineering,2015

2. Abandoned housing projects in Malaysia: pressing issues during the rehabilitation process;International Journal of Architectural Research,2013

3. Significant factors causing cost overruns in large construction projects in Malaysia;Journal of Applied Sciences,2013

4. Abandoned housing projects in Malaysia and the prospect of DP: an overview. international accounting and business conference, 2015;Procedia Economics and Finance,2015

5. Adeyemi, A.Y., Ojo, S.O., Aina, O.O. and Olanipekun, E.A. (2005), “Some empirical evidences of inadequate representation of women in the construction industry in Nigeria”, available at: www.irbnet.de/daten/iconda/CIB5956 (accessed 8 August 2017).

Cited by 20 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3