1. ACIL Tasman
. (2012), “Fuel cost projections”, Report to AEMO, ACIL Tasman Publication, Brisbane, available at: www.aemo.com.au
2. Australian Energy Market Commission (AEMC)
. (2013), “Final rule determination: potential generator market power in the NEM,”
AEMC Publication, Sydney
, available at: www.aemc.gov.au
3. Berrie, T.
(1967), “The economics of system planning in bulk electricity supply”,
Electrical Review
, Vol. 22 No. 2, pp. 425-428.
4. Besser, J.
,
Farr, J.
and
Tierney, S.
(2002), “The political economy of long-term generation adequacy: why an ICAP mechanism is needed as part of standard market design”,
Electricity Journal
, Vol. 15 No. 7, pp 53-62.
5. Bidwell, M.
and
Henney, A.
(2004), “Will NETA ensure generation adequacy?”,
Power UK
, Vol. 122, pp. 10-26.