Construction plant breakdown criticality analysis – part 1:UAE perspective

Author:

Ahamed Mohideen P.B.,Ramachandran M.,Ramasamy Narasimmalu Rajam

Abstract

PurposeThe purpose of this paper to develop a novel strategic approach to handle corrective maintenance procedure in the event of a breakdown/disruption of service. A proposal to minimize the recovery time and the breakdown cost in the system in construction plant is presented.Design/methodology/approachThe past plant breakdown records of a construction organization are considered for the analysis. From the previous breakdown records, a high level metric using Pareto analysis and the cause effect analysis is used to identify the main breakdown main codes (BMC) and the subsequent breakdown sub codes (BSC). Prioritized BMC and BSCs are used to formulate dedicated breakdown maintenance teams, which act swiftly in the event of the breakdown with the modified methods.FindingsThe study was conducted, on four different types of heavy lifting/earth moving/material handling system equipment, which are used to load/unload/haul and transport construction materials. Failure due to tyre puncture and allied problems contribute to maximum failure. A strategy plan to minimize this type of failure is proposed. With the identification of the most contributing BMCs and BSCs, it is further proposed to develop an “overall breakdown maintenance management”.Research limitations/implicationsThe collected data pertains to the construction plant located in a particular region, namely the Middle East, and hence the proposed solution is dedicated/relatively applicable to similar plant from the same region. A more robust model can be suggested considering the work environment in the other regions.Practical implicationsThe proposed methodology is highly adaptable by similar industries operating in the Middle East region.Social implicationsConstruction plant and equipment contribute to the success of construction organizations, by providing enhanced output, reduced manpower requirement, ease of work and timely completion of the project. Delays in completion of projects generally have both social and economical impact on the contractors and the buyers. The proposed model will bring down the lead‐time of the project and enable the contractors to crash down their project completion time.Originality/valueNumerous studies on preventive maintenance models and procedures are available for a system and in particular to construction plant maintenance in the literature. This model attempts to handle the issues of unpredictable breakdowns in the construction plant to minimise the breakdown time. The proposed model is a novel approach which enables a quick recovery of the construction plant, attributed from the breakdown parameters derived from the previous history of the work records/environment.

Publisher

Emerald

Subject

Business and International Management,Strategy and Management

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3