Author:
Wang Qiankun,Guo Zeng,Mei Tingting,Li Qianyao,Li Peng
Abstract
Purpose
Construction industrialization is emerging in the construction industry, as a result, buildings with prefabricated assemblies are gaining more and more ground. In most situations, the prefabricated building assemblies are installed by labor crews manually. If some assemblies are ill-designed, clashes between labor crews’ workspaces and them may occur, which will have bad effect on workers’ productivity and even incur hazard. The purpose of this paper is to provide a 4D building information modeling (BIM) based approach to find potential workspace conflicts during the installation process of prefabricated building assemblies in the detailed design process so as to eliminate them in advance.
Design/methodology/approach
First, a workspace modeling method is provided; second, three kinds of workspace conflicts are analyzed; third, a 4D-BIM-based approach is established; fourth, a prototype tool based on the approach is developed; and finally, a case study is conducted to test the tool.
Findings
The result shows that the proposed tool can detect or precaution workspace conflicts and visualize them in a series of views; in doing so, valuable information can be obtained for improving the design quality of prefabricated assemblies.
Research limitations/implications
The proposed approach and tool only concern the congestions caused by ill-designed prefabricated components; the tool needed to be further optimized for speed; the tests on the tool are limited to a single case study; and more tests are needed to verify its effectiveness.
Originality/value
This research provides a 4D-BIM-based approach and a prototype tool for installation workspace analysis. It can be used to provide support for design optimization of prefabricated building assemblies.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference44 articles.
1. Management research based on the paradigm of the design sciences: the quest for field-tested and grounded technological rules;Journal of Management Studies,2004
2. Automated generation of work space required by construction activities;Journal of Construction of Construction, Engineering and Managemeng,2002
3. Integrating resource production and construction using BIM;Automation in Construction,2010
4. Enhancing visualization of 4D CAD model compared to conventional methods;Engineering Construction & Architectural Management,2009
5. Construction workspace management: the development and application of a novel nD planning approach and tool;Electronic Journal of Information Technology in Construction,2012
Cited by
25 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献