Integrated construction consulting project performance improvement in China using network structure and team boundary-spanning behavior: a configurational analysis

Author:

Yan Ling,Chen Yichao,Cao Tingting

Abstract

PurposeThe consulting team intervenes in the integrated construction consulting (ICC) network structure centered on “client-contractor-consultant.” Team boundary-spanning behavior (TBB) driven by the network structure is crucial to project performance. This article investigated how to stimulate the consulting project performance (CPP) improvement by considering the interactive effect of network structure and TBB. To be specific, this paper explored the configuration between structural characteristics of project networks, the dimension of TBB, and project performance in ICC projects.Design/methodology/approachNetwork density and centrality were used to reflect network structure. This study collected 216 valid responses from construction professionals (including project managers, department managers, and project engineers) via a questionnaire survey and analyzed the data using fsQCA.FindingsCombining with the corresponding typical project case and analysis, the results concluded four types of configurations for achieving high performance in the ICC projects. Meanwhile, network centrality, density, ambassadorial behavior, coordination behavior, and detection behavior significantly impact high consulting project performance. Matching ICC network characteristics with the TBB is important. There are also three low performance configurations for the ICC projects. Low performance state also occurs when network centrality or density and coordination behavior is simultaneously low. Only the right match between the network characteristics and TBB can produce high consulting project performance.Research limitations/implicationsThe network centrality and density, the implementation of TBB vary, and the paths to achieve high consulting project performance are different. Clients, ICC projects, and consulting teams should choose the appropriate development paths according to the actual situation. (1) Clients should commit to applying the ICC project model with high network centrality, density, and coordination behavior of ICC enterprises to promote project performance. (2) Consulting enterprises should carry out ICC business based on detecting behavior and coordinating behavior. (3) The market should cultivate head consulting enterprises with independence and integration, and bring into play the effectiveness of consulting team ambassadorial behavior.Practical implicationsComparing the results of the four high CPP configurations, the network structure characteristics are essential, which means that in the Chinese consulting practice between the owner and the consulting firm pay attention to the use of appropriate ICC organizational structure model and arrange the degree of centralization of authorized responsibilities. Coordination behavior is necessary to achieve high CPP. Therefore, Chinese consulting firms should pay attention to effective communication and exchange with project contractors in order to get high CPP in conducting business; meanwhile, enabling behavior can achieve high CPP both in the presence and absence of configuration H1 and H4, which indicates that enabling behavior has substitution effect. Comparing the three low CPP configurations also contrarily confirms the indispensability of coordinating behavior. Comparing the results of high and low CPP configurations, the TBB is seriously missing and not properly applied in CPP enhancement. In detail, Chinese consulting firms have been regarded as independent third parties providing services, and less attention has been paid to the TBB of Chinese consulting firms in past practice, thus leading to the dilemma of inadequate empowerment of consulting firms due to their unclear status. To solve this dilemma, the findings of this paper offer a solution at the micro level to change the previous perception of consulting and demonstrate that Chinese consulting practice needs to pay attention to TBB with owners and contractors, and apply it well to enhance the reputation, management consulting level and capability, and experience and expertise of consulting firms to achieve high CPP.Originality/valueThe research results changed from the previous bilateral project governance to a new perspective of network embedding. It provided a theoretical basis for the improvement path of high consulting project performance, as well as providing ideas for clients on the organizational design of ICC projects. On the other hand, it provided a practical reference for TBB positioning of ICC enterprises for transformation and upgrading development.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference58 articles.

1. Network embeddedness in exploration and exploitation of joint R&D projects: a structural approach;British Journal of Management,2020

2. Project leaders as team boundary spanners: relational antecedents and performance outcomes;International Journal of Project Management,2012

3. The dark side of team social cohesion in NPD team boundary spanning;Journal of Product Innovation Management,2019

4. External activities and team effectiveness: review and theoretical development;Small Group Research,2002

5. Social capital in the creation of human capital;American Journal of Sociology,1988

Cited by 1 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3