Predicting delays in prefabricated projects: SD-BP neural network to define effects of risk disruption

Author:

Zhao YingORCID,Chen Wei,Arashpour Mehrdad,Yang Zhuzhang,Shao Chengxin,Li Chao

Abstract

PurposePrefabricated construction is often hindered by scheduling delays. This paper aims to propose a schedule delay prediction model system, which can provide the key information for controlling the delay effects of risk-related factors on scheduling in prefabricated construction.Design/methodology/approachThis paper combines SD (System Dynamics) and BP (Back Propagation) neural network to predict risk related delays. The SD-based prediction model focuses on dynamically presenting the interrelated impacts of risk events and activities along with workflow. While BP neural network model is proposed to evaluate the delay effect for a single risk event disrupting a single job, which is the necessary input parameter of SD-based model.FindingsThe established model system is validated through a structural test, an extreme condition test, a sensitivity test, and an error test, and shows an excellent performance on aspect of reliability and accuracy. Furthermore, 5 scenarios of case application during 3 different projects located in separate cities prove the prediction model system can be applied in a wide range.Originality/valueThis paper contributes to academic research on combination of SD and BP neural network at the operational level prediction, and a practical prediction tool supporting managers to take decision-making in a timely manner against delays.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference70 articles.

1. A multiproject perspective of single-project dynamics;Journal of Systems and Software,1993

2. Software project control: an experimental investigation of judgment with fallible information;IEEE Transactions on Software Engineering,1993

3. Factors influencing the selection of delay analysis methods in construction projects in UAE;International Journal of Construction Management,2019

4. Delay mitigation in the Malaysian construction industry;Journal of Construction Engineering and Management,2006

Cited by 20 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3