Decision-making framework for selecting ICT-based construction logistics systems

Author:

Fadiya Olusanjo,Georgakis Panos,Chinyio Ezekiel,Nwagboso Chris

Abstract

Purpose – The purpose of this paper is to discuss an integrated decision analysis framework for the investment justification of implementing alternative information and communication technology (ICT)-based logistics systems in the construction industry so as to enhance the decision-making process in selecting the best alternative. Design/methodology/approach – An integrated framework is proposed that is composed of a set of interrelated evaluation and analysis techniques that allow the identification and quantification of costs, benefits and risks involved in implementing ICT systems to mitigate problems that hinder the efficient operation of construction logistics. Such techniques include decision trees and multi-attribute decision-making under uncertainty that can be applied to the logistics planning of any new build construction project. Findings – The probabilities of providing benefits vary among the alternatives, and the probabilities will replace the uncertainties surrounding the impacts of the alternative ICT systems in addressing the identified construction logistics problems with chance events so as to estimate the expected cost of each alternative with respect to each selection attribute. Practical implications – This paper shows that it is almost certain that the analysed alternative ICT system will provide benefit because its probability of benefit is almost equal to 1. Originality/value – The framework captures the existing problems of logistics in construction process, potential solution that can address the problems through the implementation of ICT systems and the decision-making process in the selection of appropriate ICT solution. The output of the framework will help to make knowledge-based decision in selecting the best ICT system for addressing construction logistics problems.

Publisher

Emerald

Subject

General Engineering

Reference49 articles.

1. Ala-Risku, T. and Kärkkäinen, M. (2006), “Material delivery problems in construction projects: a possible solution”, International Journal of Production Economics , Vol. 104 No. 1, pp. 19-29.

2. Al-Momani, A.H. (2000), “Construction delay: a quantitative analysis”, International Journal of Project Management , Vol. 18 No. 1, pp. 51-59.

3. Ankrah, N.A. (2007), “An investigation into the impact of culture on construction project performance”, Doctor of Philosophy Thesis, University of Wolverhampton, Wolverhampton.

4. Assaf, S.A. and Al-Hejji, S. (2006), “Causes of delay in large construction projects”, International Journal of Project Management , Vol. 24 No. 4, pp. 349-357.

5. Bates, M. , Sturges, J. , McGowan, K. and Sommerville, J. (1999), The Benefits of using Capm in Construction: A Pilot Study in the Housing Sector , School of the Built Environment, Leeds Metropolitan University, Leeds, pp. 11-20.

Cited by 18 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3