Factors-driven comparison between BIM-based and traditional 2D quantity takeoff in construction cost estimation

Author:

Wahab AbdulORCID,Wang JunORCID

Abstract

PurposeQuantity Takeoff (QTO) is an integral part of the decision-making process. Currently, QTO is mostly done using manual or 2D method, and practitioners are considering the use of BIM quantity takeoff as an effective alternative to the traditional 2D software takeoff. However, the existing literature does not have adequate studies to confirm that the use of BIM-based QTO is better than the 2D method. Therefore, this paper aims to expand and improve the existing literature into a more detailed analysis of each element to investigate that BIM is indeed a better option of the two QTO methods.Design/methodology/approachA total of 19 factors in four broad categories, i.e. timely decision making, accuracy, collaboration, and level of details were identified to draw a significant comparison between the two procedures, i.e. BIM-based quantity takeoff and traditional 2D takeoff. Surveys and case study are used to collect data for analysis to achieve the research goals.FindingsThe questionnaire survey showed that using BIM for the QTO process has significant benefits in achieving higher productivity on takeoff, accuracy, clarity and collaboration among the team members. The case study results also showed improvement in BIM-based QTO by achieving higher accuracy and productivity.Originality/valueUnderstanding the difference between the two QTO processes is a challenging task; therefore, this paper contributes to drawing a comparison line between the two processes by introducing the factors that affect the QTO process.

Publisher

Emerald

Subject

General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering

Reference29 articles.

1. BIM – new rules of measurement ontology for construction cost estimation;Engineering Science and Technology, an International Journal,2017

2. Status of BIM adoption and the BIM experience of cost consultants in Australia;Journal of Professional Issues in Engineering Education and Practice,2014

3. Automated wood construction cost estimation,2017

4. Information flow comparison between traditional and BIM-based projects in the design phase,2013

5. BIM-based quantity takeoff;Stroitel'stvo Unikal'nyh Zdanij i Sooruzenij,2017

Cited by 13 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3