Author:
Zou Xin,Zhang Lihui,Zhang Qian
Abstract
PurposeThe purpose of this research is to develop a time-cost optimization model to schedule repetitive projects while considering limited resource availability.Design/methodology/approachThe model is based on the constraint programming (CP) framework; it integrates multiple scheduling characteristics of repetitive activities such as continuous or fragmented execution, atypical activities and coexistence of different modes in an activity. To improve project performance while avoiding inefficient hiring and firing conditions, the strategy of bidirectional acceleration is presented and implemented, which requires keeping regular changes in the execution modes between successive subactivities in the same activity.FindingsTwo case studies involving a real residential building construction project and a hotel refurbishing project are used to demonstrate the application of the proposed model based on four different scenarios. The results show that (1) the CP model has great advantages in terms of solving speed and solution quality than its equivalent mathematical model, (2) higher project performance can be obtained compared to using previously developed models and (3) the model can be easily replicated or even modified to enable multicrew implementation.Originality/valueThe original contribution of this research is presenting a novel CP-based repetitive scheduling optimization model to solve the multimode resource-constrained time-cost tradeoff problem of repetitive projects. The model has the capability of minimizing the project total cost that is composed of direct costs, indirect costs, early completion incentives and late completion penalties.
Subject
General Business, Management and Accounting,Building and Construction,Architecture,Civil and Structural Engineering
Reference43 articles.
1. Optimizing the scheduling of repetitive construction to minimize interruption cost;Journal of Construction Engineering and Management,2018
2. LOB and CPM integrated method for scheduling repetitive projects;Journal of Construction Engineering and Management,2013
3. Scheduling system for repetitive unit construction using line-of-balance technology;Engineering Construction and Architectural Management,2001
4. Challenges in line-of-balance scheduling;Journal of Construction Engineering and Management,2002
5. CPM/LOB scheduling method for project deadline constraint satisfaction;Automation in Construction,2014
Cited by
19 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献