Abstract
Purpose
– Little success had been recorded on concession-based public private partnership contracts in Nigeria for reasons attributable in part to poor assessment of the socio-cultural and economic factors that contribute to the parties’ costs while preparing contract packages. The purpose of this paper is to assess the factors which significantly influence the private party’s obligations and costs in a concession-based contract thereby enhancing the robust assessment of contract packages when bidding by private investors.
Design/methodology/approach
– The assessment was based on primary data obtained through questionnaire survey. Structured questionnaire was administered on professionals comprising architects, estate surveyors, quantity surveyors, engineers and builders, accountants/bankers/economists and lawyers who had been involved in concession-based contracts in the Southwestern Nigeria, selected using respondent-driven sampling approach. Factors evaluated were those identified through in-depth literature review and brainstorming of those pertinent to concession transaction in Nigeria. Data collected were analysed using descriptive statistics including mean, relative significance index, impact weighting and factor analysis.
Findings
– Significant factors that influence private party’s cost were found to be political interference, delay in land acquisition, variation to the contract and non-availability of supportive infrastructure.
Originality/value
– Findings provided information for structuring concession contract for effective management of country-specific characteristics in concession contract. The understanding of the factors that affect private party’s obligations and costs would guide effective assessment of concession contract in developing economies by foreign investors. Moreover, the study provided implication for the understating of country-specific factors affecting concession contract in Nigeria which would contribute to robust assessment of contract packages when bidding by private investors.
Subject
Building and Construction,Civil and Structural Engineering
Reference44 articles.
1. Adeniyi, O.
,
Aje, I.O.
and
Ogunsemi, D.R.
(2011), “Strengths, weaknesses, opportunities, and threats for public-private partners in infrastructure delivery in Nigeria”,
Journal of Construction Project Management and Innovation
, Vol. 1 No. 2, pp. 130-154.
2. Akbiyikli, R.
(2013), “Performance assessment of a private finance initiative road project”,
Transport
, Vol. 28 No. 1, pp. 11-24.
3. Akinsiku, O.E.
,
Babatunde, S.O.
and
Opawole, A.
(2014), “Adoption of public-private partnerships (PPP) procurement method on infrastructure delivery in Nigeria”,
The Quantity Surveyors
, Vol. 58 No. 1, pp. 3-12.
4. Babatunde, S.O.
,
Opawole, A.
and
Akinsiku, E.O.
(2012), “Critical success factors in public-private partnership (PPP) on infrastructure delivery in Nigeria”,
Journal of Facilities Management
, Vol. 10 No. 3, pp. 212-225.
5. Babatunde, S.O.
,
Perera, S.
and
Lei Zhou, L.
(2016a), “Methodology for developing capability maturity levels for PPP stakeholder organisations using critical success factors”,
Construction Innovation
, Vol. 16 No. 1, pp. 81-110.
Cited by
5 articles.
订阅此论文施引文献
订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献