Managing risk in green building projects: toward a dedicated framework

Author:

Javed Nida,Thaheem Muhammad JamaluddinORCID,Bakhtawar Beenish,Nasir Abdur Rehman,Khan Khurram Iqbal Ahmad,Gabriel Hamza Farooq

Abstract

Purpose The formal application of project risk management (PRM) in green building projects is still an emergent part of project management. The purpose of this paper is to provide a conceptual PRM framework that increases the probability of success in green building projects by minimizing unexpected events. Design/methodology/approach This paper interprets the related literature and uses the opinion of green building experts. It exposes some pertinent elements needed for structuring the PRM framework and suggests some mitigation actions for high-ranked risks. It also performs ex-post analysis on a case study to practically validate the proposed framework. Findings It is found that high initial cost, lack of experienced contractors and subcontractors, consideration of lifecycle inflation and experience in green building project management are the most significant risks. To address them, the framework proposes a rigorous selection of contractors, provision of financial incentives from the government, setting of a time buffer to accommodate legal process and development of a deliberate proactive financial model. Originality/value This paper contributes to the body of knowledge and practice by providing a reasonable strategy for employing the PRM framework capable of effectively managing risk in green building projects to keep organizations competitive within the business environment. The overall aim of this study is to contribute to the further development of the area of risk assessment and risk management from a knowledge-based perspective.

Publisher

Emerald

Subject

Management, Monitoring, Policy and Law,Urban Studies,Building and Construction,Renewable Energy, Sustainability and the Environment,Civil and Structural Engineering,Human Factors and Ergonomics

Reference52 articles.

1. Measuring the mathematical attitudes of elementary students: the effects of a 4-point or 5-point likert-type scale;Educational and Psychological Measurement,2010

2. Building information modeling as a risk transformer: an evolutionary insight into the project uncertainty;Automation in Construction,2018

3. Knowledge-based risk management framework for information technology project;International Journal of Information Management,2012

4. Likert scales and data analyses;Quality Progress,2007

5. Risk management for sustainable restoration of immovable cultural heritage, part 1: PRM framework;Journal of Cultural Heritage Management and Sustainable Development,2014

Cited by 15 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3