Factors affecting the accuracy of cost estimate during various design stages

Author:

Dandan Tala Hassan,Sweis Ghaleb,Sukkari Lilana Salem,Sweis Rateb J.

Abstract

Purpose The purpose of this paper is to identify factors affecting cost estimate accuracy in each of five design stages preceding building construction: order of magnitude, conceptual/schematic, detailed design, construction document and bid phase. Design/methodology/approach Data were collected using an online survey completed by 138 respondents who work in design consultancy firms in Jordan, including project managers, architects and quantity surveyors (QSs). Survey responses were analyzed using descriptive statistics. Confirmatory interviews and case study comparisons were used to confirm the statistical analysis results. Findings The results of this study indicated that each design stage’s cost estimate was affected by several factors. Two significant factors were common across four of the five design stages: client experience and project team experience. In addition, a high level of agreement was observed among the project managers, architects and QSs regarding the factors affecting cost estimate accuracy. Originality/value Accurately estimating building construction costs during the design process has posed a challenge for designers and their clients in Jordan. Despite the care and effort involved in preparing cost estimates in each of the five design stages, deviations are commonly observed. Because the accuracy of building construction cost estimates directly affect the success or failure of a project, the results of this study can be used to reduce uncertainties in building construction cost estimation and subsequently increase the likelihood of project success

Publisher

Emerald

Subject

General Engineering

Reference61 articles.

1. Abdal-Hadi, M. (2010), “Factors affecting accuracy of pre-tender cost estimate in Gaza Strip”, Unpublished Master Thesis in Construction Management, The Islamic University Of Gaza, Gaza Strip.

2. Why do the design stage elemental cost plan and final tender sum differ in New Zealand;Journal of Financial Management of Property and Construction,2015

3. Risk impact assessments in project budget development: architects’ perspectives;Architectural Engineering and Design Management,2016

4. Accuracy in design stage cost estimating through risk contingency analysis: a theoretical exploration;Construction Research Congress 2014: Construction in a Global Network,2014

Cited by 11 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3