Resource budget for workface planning in industrial-construction

Author:

Siu Ming Fung Francis

Abstract

Purpose The purpose of this paper is to develop a novel analytical approach for workface planning practice in industrial-construction sector such that the construction work package (CWP) resource budget can be sufficiently planned for delivering possible field installation work package (FIWP) schedules with work uncertainty. Design/methodology/approach The relationship between CWP resource budget and FIWP schedules is first elucidated based on workface planning practice. The literature of work packaging, workface planning and project scheduling is reviewed. A novel analytical approach is then developed to quantify CWP resource budget based on a probability theory, in consideration of the probability of occurrence of feasible FIWP schedules formulated based on a resource scheduling approach. The results of case studies given by the new approach are cross validated by using simulation and optimization techniques. Findings The new analytical approach can assist workface planning by quantifying the expected CWP resource budget to deliver the FIWP work scope with certain activities that are planned at project level and with uncertain activities that are found at workface level. Practical implications The new analytical approach helps project and workface planners to reliably deploy CWP resource budget for delivering FIWP schedules instead of guessing the budget based on experience. An industrial-construction project for upgrading oil-sands refinery facility is used to show the practical implications. Originality/value This research develops a new analytical approach for workface planning practice to determine sufficient CWP resource budget for delivering feasible FIWP schedules with work uncertainty.

Publisher

Emerald

Subject

Building and Construction,Architecture,Human Factors and Ergonomics

Reference46 articles.

1. Automated construction simulation optimization;Journal of Construction Engineering and Management,1994

2. Resource-constrained project scheduling: notation, classification, models and methods;European Journal of Operational Research,1999

3. Method to assess the level of implementation of productivity practices on industrial projects;Journal of Construction Engineering and Management,2014

Cited by 4 articles. 订阅此论文施引文献 订阅此论文施引文献,注册后可以免费订阅5篇论文的施引文献,订阅后可以查看论文全部施引文献

1. Organization of Material Resources Supply in Transport Construction;Lecture Notes in Networks and Systems;2022-11-16

2. Definition Model of the Optimal Size of the Material Resources in Construction;Lecture Notes in Networks and Systems;2022-11-16

3. Organizing Construction Logistical Support;International Scientific Siberian Transport Forum TransSiberia - 2021;2022

4. Hybrid multi-mode simulation and optimization for subarea scheduling in heavy industrial construction;Automation in Construction;2021-05

同舟云学术

1.学者识别学者识别

2.学术分析学术分析

3.人才评估人才评估

"同舟云学术"是以全球学者为主线,采集、加工和组织学术论文而形成的新型学术文献查询和分析系统,可以对全球学者进行文献检索和人才价值评估。用户可以通过关注某些学科领域的顶尖人物而持续追踪该领域的学科进展和研究前沿。经过近期的数据扩容,当前同舟云学术共收录了国内外主流学术期刊6万余种,收集的期刊论文及会议论文总量共计约1.5亿篇,并以每天添加12000余篇中外论文的速度递增。我们也可以为用户提供个性化、定制化的学者数据。欢迎来电咨询!咨询电话:010-8811{复制后删除}0370

www.globalauthorid.com

TOP

Copyright © 2019-2024 北京同舟云网络信息技术有限公司
京公网安备11010802033243号  京ICP备18003416号-3